FLOC15 DAF — Pilot Rentals from November 2025
From November 2025, our FLOC15 Dissolved Air Flotation (DAF) unit will be available for rental as a pilot (short-term) or as a long-term fixed asset. The compact, plug-and-play system helps operators prove concepts at scale, support regulatory compliance, and trial Tanfloc’s plant-based coagulants under real site conditions.
Why choose the FLOC15 pilot
- High-efficiency removal of fats, oils, grease (FOG), suspended solids (TSS), and phosphorus/particulate nutrients
- Cleaner water, lower sludge volumes, and reduced chemical demand
- Rapid mobilisation: small footprint and simple utilities; we can be on site quickly once confirmed
- Full commissioning and on-site support from experienced process engineers
- Operator training with SOPs and a simple performance report (before/after results and key operating settings)
What’s included
- Delivery, set-up and commissioning
- Start-up tuning and process checks
- Operator coaching and safety guidance
- Performance snapshot against agreed KPIs (e.g., TSS/FOG %, phosphorus reduction), dose windows, indicative sludge kg/ML
- Optional: chemical programme optimisation (including trials with Tanfloc) and additional sampling/analysis
Is your site a good fit?
- Typical and peak flow rates, temperature and pH
- Basic influent quality (TSS/FOG, COD/BOD, phosphorus)
- Space and access for a small skid, 3-phase power, water/air connections
- Sludge handling and disposal plan during the pilot
- Sampling points or lab access for verification
Commercial options
- Flexible rentals: pay-as-you-go and short contracts
- Water-as-a-Service where operation is required
- Pathway to purchase after the pilot if desired
How the pilot works
- Site-readiness check
- Mobilisation and commissioning
- Optimisation and training
- Run period and data collection
- Performance report to support internal decisions
Technical specifications
See the brochure for full specifications and features. The brochure will be available on this page.
Availability
One pilot unit available from November 2025. Contact us to book a site-readiness check or reserve the pilot window.